Peoria Logistics Park

Contracted under GC

Subcontracted Project: Worked under a General Contractor for the Peoria Logistics Park, a 158-acre industrial park in southern Peoria, Arizona.


Cost: $1.425 million.


Market: Site Utilities.


Strategic Location: Near Loop 101 and Grand Avenue (US 60), with easy access to major interstates and 6-9 miles from I-10.


Site Readiness: Shovel-ready with existing infrastructure and zoning for industrial use, suitable for semiconductor facilities.


Scope: Onsite and offsite utility installations and asphalt improvements for a 155,000 SF tilt-up, build-to-suit distribution facility.


Utility Infrastructure: Water, sewer, gas, electric, and communication services adjacent to the property, provided by City of Peoria, Southwest Gas, and CenturyLink.


Water Line Installation:

Installed 5,361 feet of 4", 6", and 8" DIP.

Installed 1 16x8" Tapping Sleeve.

Installed 9 8" Gate Valves.

Installed 13 6" Gate Valves.

Installed 4 4" Gate Valves.

Installed 12 Fire Hydrants.

Completed 5 Vertical Realignments.

Installed 1 Blow Off.

Installed 1 4" Backflow.

Installed 2 Remote FDCs.


Sewer Line Installation:

Installed 959 feet of 6" and 8" PVC.

Installed 3 48" Manholes.

Installed 2 6" Cleanouts.


Storm Drain Installation:

Installed 111 feet of 18" and 24" HDPE.


Irrigation Line Installation:

Installed 629 feet of 24" RCP.

Installed 1 Irrigation Box.


Asphalt Replacement:

Replaced 794 square yards of asphalt.


Reliable Power Supply: SRP operates a major substation and power generation facility across the street, ensuring steady power.


Developer Partnership: The VanTrust Group, developer/partner on the site, facilitates build-to-suit/lease-back facilities.